Lunar Levitator Mission Development
This is to update those interested in
levitator
progress.
1. Levitator propulsion is adequate or better to
meet mission requirements.
2. All propulsion and flight control
performance
is tested indoors.
3. All tracking and radio control is tested
indoors
or out doors at sea level before
launch.
4. All long range tracking, navigation and
guidance
is emulated on Space Simulator before
launch.
5. All equipment, parts and materials needed are
in house now and launching will begin when
all
subsystem testing is completed and the
vehicle
and the ground station are assembled and
test
flown indoors.
How Wachspress